Completed track panel rests on assembly table, in the track shop. At the far end of the table is the twin router setup that prepares the ties for tie plates. On the floor, in front of the second table is a track panel assembly jig. The machine that is to the left of the water cooler is part of the screw gun that is used in the construction of track panels. A portion of a curve track panel jig is visible to the right of the photo behind the second table.

Return to Train Mountain Supplement


The Gandy Dancer, A monthly publication of the Alameda County Central Railroad Society, Inc.
Copyright ACCRS, Inc 2001 all rights reserved
Last Revised October 14, 2001
For more information contact Robert Johnson, Editor